The Øresund Bridge closed to all car traffic tonight

Sixth since 2000
The exercise will take place on the motorway and in of the railway tunnels. It will test the cooperation in the event of an accident.

Trains to and from will continue to run during the exercise, but with lower departure frequencies.

Stay informed about the train schedule via the Itinerary.

This is the sixth since the bridge opened in 2000 that a full-scale training exercise has been held.

Every day, about 20,000 and 200 trains cross the bridge between and Sweden.

Source: The Nordic Page


Posted

in

by

Related Posts